PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Welding clips along the column at the 2nd Floor  West Elevation (800x600).jpg Installed conduit all the way up to the 4th Electrical Room 469 Facing South (800x600).jpg Installing duct work at the 1st Floor Facing East (800x600).jpg Installing split wire above the cealing at the 4th Floor Facing West (800x600).jpg Welding clips along the columns at the 4th Floor East (800x600).jpg Welding tube steels at the top of the main steel column (Monumental Stairs) Facing South (800x600).jpg
Previous pageNext page Welding clips along the columns at the 4th Floor East (800x600)
Welding clips along the columns at the 4th Floor East (800x600)